Due by: 3/19/2010
|
| |
This project generally includes the purchase of three (3) 2010 Ford F-150 pickup trucks. |
|
Download Full Project File
|
 |
Due by: 3/19/2010
|
| |
This project generally includes preserve access and parking, trails, overlooks, latrine, boat launch and dock, shoreline fishing, stormwater management and restoration, native plantings, and structures such as a bridge, fishing pier, and picnic shelter.
A mandatory pre-bid meeting will be held at 9:00 a.m. on Monday, March 15, 2010 at the Sugar Creek Administration Center. Following the meeting the site will be opened for viewing. Attendance is not mandatory for the site visit. Interested bidders may also visit the site on their own by parking outside the gate and walking in.
Please note that the project manual file is 6.79 MB, and the project drawings file is 46.2 MB. These files may take some time to download. If you are unable to download the files, you may obtain a paper copy at the Sugar Creek Administration Center, 17540 W. Laraway Road, Joliet, Illinois. |
|
Download Full Project File
|
 |
Due by: 3/8/2010
|
| |
The intent of this project is to construct a 66’x 80’ pre-manufactured building designed by FBI Buildings or equal and to renovate current office space. Renovation will include removal of furniture walls and flooring back to the original two bay vehicle and equipment area. The project will also include parking area, utilities, re-roof three existing pole buildings and replace all sliding doors with overhead doors, and other site amenities. |
Bidding is now closed for this Project. View the bidders list.
|
 |
Due by: 2/8/2010
|
| |
This project generally includes disabling drain tiles by excavating and breaking sections of pipe and, as an alternate, creating wooden sills in ravines to slow erosion. |
Bidding is now closed for this Project. View the bidders list.
|
 |
Due by: 2/5/2010
|
| |
This project generally includes removal of garlic mustard using foliar treatment and base clippings at Messenger Woods Nature Preserve, Hickory Creek Barrens Nature Preserve, and McKinley Woods Preserve. |
Bidding is now closed for this Project. View the bidders list.
|
 |
Due by: 2/5/2010
|
| |
This project generally includes herbicide treatment of Phragmites australis at Romeoville Prairie, Phalaris arundinacea (two treatments: spring and fall) at Romeoville Prairie Nature Preserve, Sand Ridge Savanna Nature Preserve, and Goodenow Grove Nature Preserve, as well as invasive brush control at Keepataw Preserve (predominately Lonicera spp. and Rhamnus cathartica). |
Bidding is now closed for this Project. View the bidders list.
|
 |
Due by: 1/29/2010
|
| |
This project generally includes herbicide treatment of herbaceous weeds and invasive brush within natural areas, native interseeding of open ground, and related work at Rock Run Preserve South, Rock Run Preserve North, Theodore Marsh Preserve, Lake Renwick Preserve, Four Rivers Environmental Education Center, and Whalon Lake Shoreline. |
Bidding is now closed for this Project. View the bidders list.
|
 |
Due by: 1/29/2010
|
| |
This project generally includes pre-seeding weed control, native seed installation, maintenance mowing, and invasive species control for 9 to 15 acres at Riverview Farmstead Preserve. The project area is located south of the intersection of Hassert Boulevard and Book Road in Naperville, Illinois. |
Bidding is now closed for this Project. View the bidders list.
|
 |
Due by: 1/27/2010
|
| |
This project consists of engineering services for passive recreation improvements of the Lake Chaminwood Preserve in Channahon, Illinois, including an access area with parking, shoreline trail, boat launch for canoes and kayaks, shoreline fishing, water body crossing structure, and associated amenities. |
Bidding is now closed for this Project. View the bidders list.
|
 |
Due by: 1/25/2010
|
| |
This project generally includes delivery of approximately 12,000 gallons of E-85 Ethanol,
approximately 33,000 gallons of 87-Octane Gasoline, and approximately 15,500 gallons
of B-11 Biodiesel. |